On Dec. 26th I made a list of what was left to be done
http://homerepairjournal.blogspot.com/2005/12/punch-list.htmlSo here's the list and where I'm at:
Thermostat (buy and install)
Put the old one back, not doin itCarpet (buy and install)
Done!doors (paint, clean, re-hang)
Cleaned and re-hung. Didn't paint them. Replaced the closet door latchesTub Faucet (Call Delta about the faucet not shutting off right)
The cartridge was in backwards...I mighta messed it up, $40 for a new onePaint Trim (topcoat bathroom, touch up elsewhere)
DoneStove (buy and install)
DoneAccess panel for Bathroom Plumbing (cut, paint, install)
DoneStorm Windows in Hallway (find, clean, install)
Done (1 has broken glass and 1 is missing)Paint Lazy SusanFix UnderSink Shelf (new wood, better support, tile with leftover floor tiles(?))
uh...yeah, right.Doorbell (fix? replace?)
ReplacedPuck Lights (Install in kitchen including mounting new wall switch)
DoneTransition Strips ((between rooms), buy, install)
DoneRe Caulk Bathroom (?)
Some done, some still thinkin about itBathroom Fixtures (I still don't know where to put the TP holder)
Need to buy a 'set screw' screwdriver so I can get them apart to hang themBlinds (buy and install...I don't want to leave it up to someone else to pick and try to hang them)
DoneOther than the couple of things in the bathroom...all that's really left is carrying all my tools and supplies down from the third floor to the basement and giving everything a quick final cleaning.Should be able to wrap it up tomorrow.